Copthall Bridge, Harrogate


Projects
Copthall Bridge, Harrogate
Time Limit were appointed by HACS Construction to provide the glazed screens on this project for Workwell.
Across floors one to three the Polar 30 Single Glazed system with 12.8mm acoustic laminate glass and applied bars with timber doors were specified to fulfil the design requirements. Sonik Sliding doors were also installed on these floors to provide seamless access to individual work booths.
The ground floor required enhanced acoustics and privacy for its mix of meeting rooms and single work booths, therefore the Polar 54 Double Glazed system with 12.8mm and 14.8mm acoustic laminate glass was specified.
We also installed Komfort’s Fire Screens incorporating several EI30 steel doors on the ground floor.
This was a fine example of the Komfort Partner Programme coming to fruition as we were able to provide fully certified systems to meet the design and specification.